4c0b4fab48
Adds `pr6-routes-paths-workspace.md`: - Scope summary (routes + repos + Paths + middleware + migration script + lifespan + T5.11) - Per-task commit table (T5.11 + T6.1..T6.15) - Acceptance checklist with the 64 net-new test count and 17 flake breakdown - Architecture decisions (404 not 403, check_access signature, three-state semantics, path shape, fallback workspace) - Live smoke command list for the migration follow-up - File structure index (new vs modified) Updates STATUS.md: - One-line status moves to PR6 merged, T5.11 cleared as PR6 deliverable - 8-PR status table: PR6 row marked merged with commit range and impl note link - Skipped/deferred rows: T5.11 struck as completed, new PR6 T6.15 live-smoke row added - Next-step suggestion switches to PR7 (CI boundary static scan); PR8 noted parallelisable